Production proof is different
from performance proof.

Scale answers one question: can this run at volume, every day, across many processes? It is a precondition for performance, not a substitute for it.

How production scale accumulates.

The same operation, measured at different time horizons.

  1. 01Cumulative baseline42.28M cases through Q1 2026.
  2. 02Quarterly run-rate2.96M cases in Q1 2026.
  3. 03Monthly volume1.03M cases in March 2026.
  4. 04Conversation minutes25.29M cumulative.
  5. 05Operating capacity126.3 FTE average in Q1 2026.
  6. 06Process breadth84 operating process instances.

The scale register.

Operating figures from official public reporting, kept separate from process performance.

Cases

42.28M

Cumulative through 31 March 2026.

Minutes

25.29M

Conversation minutes, cumulative through 31 March 2026.

Q1 cases

2.96M

Group Vee, Q1 2026.

Q1 minutes

1.59M

Group Vee, Q1 2026.

March cases

1.03M

Group Vee, March 2026.

March minutes

574.64K

Group Vee, March 2026.

What scale proves, and what it does not.

Scale and effectiveness are two different claims, and they need two different kinds of evidence.

Scale proves that the operation exists: telephony, integrations, quality control and human escalation all hold up across millions of cases and many processes at once.

It says nothing about whether a specific process improved a specific outcome. That claim needs a metric, a denominator and a comparator, which is what the performance evidence provides.

Scale answers

  1. 01Can it run at volume?
  2. 02Does it hold across processes day to day?
  3. 03Is the operation real?

Source and date register.

Every operating figure carries its period and its source.

Source register
FigureValuePeriodSource
Cases processed42.28MCumulative to 31 Mar 2026Official public baseline
Conversation minutes25.29MCumulative to 31 Mar 2026Official public baseline
Q1 cases2.96MQ1 2026Official public reporting
Q1 conversation minutes1.59MQ1 2026Official public reporting
March cases1.03MMarch 2026Official public reporting
March conversation minutes574.64KMarch 2026Official public reporting
Average operating capacity126.3 FTEQ1 2026Operating dashboard
Operating process instances84Q1 2026Operating dashboard

Scale is necessary, not sufficient.

A large operation that cannot show what it changed is still just a large operation.

  • Volume belongs next to performance, never in place of it.
  • Operating figures are dated and sourced.
  • Process performance is quoted with its denominator and comparator.

Where to go next.

Production scale connects to performance evidence, the processes behind it and the company that runs it.

Add performance proof to production proof.

We will show what a specific process can prove, not just how much it runs.